TEKNOLOGI B INSTITUT ☐ Gundih field is a gas field, has been in production since the end of 2013. CO2 content which is generated directly from this field is 21% of the produced gas. After the CPP (Cental Processing Plant), about 15% of the total product is separated as almost pure CO2, which equivalent with 800 tonnes per day of CO2. ☐ The gas is produced from the 3 main structures, which are situated inside the Gundih field, namely Kedung Tuban, Randu Blatung and Kedung Lusi stuctures, which can produce around 60 MMSCFD within 12 years. 1920 G 6