Russian Forestry and Wood Supply Operations Analysis
76
PRIORITY INVESTMENT PROJECTS
PRIORITY INVESTMENT PROJECTS
Volume of
Investment,
million Rubles.
Investor / Name of Project / City
Incl.
Total Borrowed
Funds
Volume of the
material, th m³
consumed raw
Allowable cut
size, thsd. m³
Types of Products and
Annual Production Volumes
Imployment
impact
(number of man)
Period
of Construction
Payback Period,
Number of Years
Volume of
Investor / Name of Project / City
Investment,
million Rubles.
Incl.
Volume of the
Angara Paper • Lesosibirsk
Building of the wood-chemical complex Angara Paper
(Yeniseisky LHK)
Yeniseu Plywood Plant Sosnovoborsk
Business development in timber-processing
7,680 2,350 900
1,886.5
Plywood - 350 thsd m³
Veneer 100 thsd m³
544 2008-2010
6
Was put into operation in 2011. Production was stopped in November 2014 by Rospotrebnadzor because of the high level of maximum allowable concentration of methanol and formaldehyde in the air. Credit funds
from VTB of 5,329,761,700 rubles were loaned. The plant has been declared bankrupt. The media have noted the bad loan credited by VTB to its own enterprise, which might have been used for moving funds offshore.
The main problem stated was the lack of quality raw materials in the rented forestry funds
Sanitary paper - 60 thsd t
Thermomechanical Pulp - 220 thsd t
30,747.5 21,523.2 5,000 6,869.3 White line box cardboard - 320 thsd t
Cardboard from unbleached kraft pulping - 320
thsd t
Total Borrowed
Funds
FAR EASTERN FEDERAL DISTRICT
consumed raw
material
material, th m³
Allowable cut
size, thsd. m³
Types of Products and
Annual Production Volumes
Imployment impact
(number of man)
Period
of Construction
Payback Period,
Number of Years
Les Export
Dalnerechensk
Three-ply parquette board production
PRIMORSKY KRAI
2,447 1,395 91.2
128.5 Parquette - 1,757 thsd m²
150
2008-2012
4
No information
560
2008-2012 8.4
Primorsklesprom
Only pre-project works have been fulfilled. Sodra Group (Sweden) withdrew from the project in the beginning of 2013. The management of Angara Paper announced that an updated concept of the project had been
prepared, and an EPC-contractor had been found - the Japanese Marubeni Corporation. According to data of Forest Forum Greepeace, the main shareholder OAO Angara Paper, is the Cypriot company Brazzako
Limited (74.9% shares)
Wood-sawing plants in Terneysky and Olginsky districts,
glued timber plant in Chuguevsky district
309.7 195.6 360
200
Sawn timber - 130 thsd m³
Glued timber - 50 thsd m³
No info
2008-2013
(started in 2014)
5.2
All the three wood-sawing plants are built, although within 2013-2014 they did not operate steadily because of prolems with raw materials and sales
Terneyles • Terneyski district
Sibles Project Yeniseisky district, Verkhnepashino
693
613
300
Sawn timber - 120 thsd m³
200.5 Moulded strips - 18 thsd m³
3,979.4 3,979.4 685 392.5
345
2008-2013 5.8
Creation of timber-processing infrastructure
Sawn timber - 150 thsd m³
Veneer -267 thsd m³
325
2008-2010
(started in 2009)
4.2
Modernization of timber-processing production
Technological wood chips - 90 thsd m³
No information
Production was put into operation in 2014, the second phase and pellet workshop are being built now
SAKHALIN OBLAST
KLM-Eco
Krasnoyarsk
470 470
300
236.8 Moulded strips - 90 thsd m³
167
2009-2011 5.5
Development of woodworking complex
Production of glued beam and sets of houses started at the end of 2013
Aleksandrovsk-Sakhalinsky district
Managing Company Mekran Krasnoyarsk
BM Sakhalin (part of the holding Business-Marketing)
Woodworking production
Dry sawn timber - 80 thsd m³
Planed sawn timber - 100 thsd m³
7,167 6,100 465
747
Technological wood chips- 370 thsd m³
Fuel pellets - 62 thsd t
686
2012-2023 9.2
5,636.4 4,600 118.6
1186 Furniture from solid wood - 5,660.4 million rubles
939
2009-2011 7
Creation of full cycle woodworking production
In the stage of organization of logging sites, exporting round log to China. It is planned to build a plant in 2015
The first Mekran furniture plant was modernized in 2010, and the new furniture production was put into operation in 2013
Novoeniseysky LHK • Lesosibirsk
KHABAROVSK KRAI
351.1 252.2 226
226
Pellets 80 thsd t
29
2009-2012
(started in 2013)
4.2
Amur Forest Solnechny district, Berezovy settlement
Wood-sawing plant
856.8 856.8 300
114
Sawn timber - 150 thsd m³
120
2008-2009
(started in 2009)
5
Growth of timber-processing production and organization of the
forestry infrastructure
A paper mill and new sawn timber production are in the plans of Novoeniseysky LHK
Firma Master Krasnoyarsk
Solid wood processing
The latest coverage in the media was in 2011
Doeble-edged boards - 45 thsd m³
Floor board -6.72 thsd m³
1,482.4 1,189.2 214.6 214.6 Lining - 6.72 thsd m³
207
2010-2015 4.1
Furniture board- 6.72 thsd m³
Glued window timber - 6.72 thsd m³
The second stage was set in operation in 2014, it was announced at the end of the year about the plant stoppage because of a claim caused by fire at a waste tip
SP Arkaim Vanino district
2,375.9 1,960.7 825 636
Chipboard 140 thsd m³
Sawn timber - 350 thsd m³
560
2008-2010
(started in 2009)
7.2
Woodworking complex for chipboard and sawn timber production
The second stage startup was planned for 2012. Non-payment of wages, strikes by workers, and criminal cases. $600 million credit from China Forest Products Corporation, plans for creation of the Russian-Chinese
woodworking holding with the logging volume up to 3.7 million m³ and processing facilities up to 2 million m³ of timber per annum
LPK Partner-Tomsk • Tomsk
MDF production
Priangarsky LPK (UK Lespromtekhnologii) • Kodinsk
Organization of timber-processing
2,200
1,500 630
Sawn timber-300 thsd m³
1,400 Fuel briquettes - 25.32 thsd t
Wood charcoal - 2.56 thsd t
480
2011-2018 7
Sawn timber production was started in spring 2014, it is planned to reach estimated capacity in 2016. A pellet production is in the plans
TOMSK OBLAST
6,308.9 5,083.1 570 575.6 MDF 264 thsd m³
Rimbunan Hijau • Lazo district, Khor settlement
MDF and THDF plant
2,400 2,400 300 262 MDF/THDF boards - 150 thsd m³
360 2008-2009 8.2
Was put into operation in 2011. The production was stopped in 2012, because of the high cost of raw materials and index of formaldehyde emission. In March 2015 the leadership of Rimbunan Hijau announced about
plans of construction of a wood-sawing plant and production of their own glue, which would make it possible to resume MDF production
An OSB plant is planned
ALTAI KRAI
Sodruzhestvo (LHK Altailes) Pavlovsky district
Plant for production of sets of houses from glued timber
337
210
141
121
| Детали домов из клееного бруса 18 тыс. м³
134
2006-2015
(started in 2010)
5.4
Dallesprom
Amursk
700
2008-2010
(started in 2010)
Far Eastern center of deep timber-processing
6.5
Sawn timber - 230 thsd m³
12,054.9 12,008.1 2,133
2,133
Rotary-cut veneer - 300 thsd m³
MDF boards 300 thsd m³
Technological wood chips- 750 thsd m³
1,000
2009-2019
Part of RFP Group. Creditor - Vnesheconombank. Veneer production was set in operation in 2013
Asia Les (UK Amurles, part of the holding Business-Marketing)
Solnechny district, Berezovy settlement
Production of profile and planed sawn timber
500 No info 500
No info
10
10
Round timber - 150 thsd m³
Dry sawn timber - 290 thsd M
Planed sawn timber - 60 thsd m³,
Pellets 100 thsd t
No info 2012-2015 No info
No information
Kamensky LDK (LHK Altailes) • Kamen'-na-Obi
Wood-sawing production
568
1,000
542 No info
Sawn timber-240 thsd m³
thsd ha
120
2009-2011
(started in 2011)
No info
KEMEROVO OBLAST
Anzhersky Plywood Plant Anzhero-Sudzhensk
2,405.3 2,105.3 333.7 333.7
Oversize plywood production
Oversize plywood - 60 thsd m³
Sawn timber - 6 thsd m³
745
2009-2018 9.6
Amur Forest Zeya
Building of woodworking plant
It was behind schedule, and consequently was mooted to close, but in 2014 it was announced that the project was to continue
Wood-sawing and pellet equipment has been purchased. Production facilities are being increased
AMUR OBLAST
Sawn timber - 105 thsd m³
352 345.6 175 34.2 Fuel granules - 3 thsd t
Wood houses - 50 pieces
270
2007-2013 8.7
At the end 2009 building works were stopped (75% is at the stage of readiness) because of difficulties with financing and default on an obligations by subcontractor 000 Videmann Poland. In October 2010 a new
subcontractor 000 PSP Redox was chosen, although in spring 2014 construction works were not resumed. In February 2015 the continuation of construction was announced
Turanles
Tyndinsky district
Mariinsly Plywood Plant Mariinsk
3,734
No info
No info
No info
OSB, OPB and chipboard production
OSB, OPB 99,6 thsd m³
Chipboard - 20,4 thsd m³
Building of the woodworking plant Vostochny
No info 2011-2015 No info
Sawn timber - 8 thsd m³
Glued timber - 1.2 thsd m³
Square beam -14 thsd m³
346.8 168
116.8
116.8 Moulded strips- 1.6 thsd m³
Floor board -1.5 thsd m³
Furniture board - 0.2 thsd m³
Set of low-rise house construction - 20 pieces
105
2006-2015 9
Vnesheconombank issued credit, the construction works are in process
AVA Company • Omsk
OMSK OBLAST
Sawn timber - 61.4 thsd m³
Furniture board- 3.4 thsd m³
Parquette -8.7 thsd m³
948.6
948.6 277.6
277.6 Moulded strips- 2.1 thsd m³
1760
Fair furniture workpieces - 1.45 thsd m³
2006-2012
(started in 2010)
Ecoles Company • Birobidzhan
8.1
Creation and modernization of objects of forestry
Wood briquettes - 20 thsd t
and timber-processing infrastructure
Construction of a pellet plant was started in 2013. There is no information about the woodworking plant
JEWISH AUTONOMOUS OBLAST
Sawn timber - 72 thsd m³
Wood charcoal - 10 thsd t
655.9
382.2 325
325
Activated wood charcoal - 0.9 thsd t
804
2010-2014 2.5
Fuel briquettes -3.24 thsd t
Glued timber and furniture board - 20.75 thsd m³
Furniture 192 million rubles
Realization of the project was stopped in 2012, because the Chinese investors refused to finance
Timber-processing production
AVA Company is planning to build a similar plant for birch processing in the Tyumen' Oblast
#6 (2015) RUSSIAN
FORESTRY
RUSSIAN #6 (2015)
FORESTAY
77View entire presentation