Production outlook - supplementary guidance Copper¹ Units 2020 2021 2022 H1 2023 2023F 2024F 2025F Chile: 562 Chile: 249 Chile: 530-580 Chile: 550-600 Chile: 530-580 kt 647 647 Peru: 102 Peru: 138 Peru: 310-350 Peru: 360-400 Peru: 310-350 Platinum Group Metals - M&C by metal³ Moz Pt: 1.8 Pd: 1.2 Other: 0.8 Pt: 2.0 Pd: 1.4 Other: 0.9 Pt: 1.9 Pd: 1.2 Other: 0.9 Pt: 0.8 Pd: 0.6 Other: 0.4 Pt: 1.6-1.8 Pd: 1.2-1.3 Other: 0.8-0.9 Pt: 1.6-1.8 Pd: 1.2-1.3 Other: 0.8-0.9 Platinum Group Metals - Refined7 Moz Iron Ore (Kumba)³ Iron Ore (Minas-Rio)⁹ 2.7 5.1 3.8 1.7 3.6-4.0 3.6-4.0 Pt: 1.6-1.8 Pd: 1.1-1.2 Other: 0.8-0.9 3.3-3.7 Mt 38 41 38 19 35-37 37-39 39-41 Mt 24 23 22 12 22-24 24-26 25-27 1. Copper business only. On a contained-metal basis. Total copper is the sum of Chile and Peru. Production guidance in Chile is subject to water availability. 2. Nickel operations in Brazil only. The Group also produces approximately 20 kt of nickel on an annual basis as a co-product from the PGM operations. Nickel production is impacted by declining grades. Bulk ore sorting unit benefits 2024, and 2025 is impacted by a maintenance shutdown. 3. 5E+ gold PGMs produced metal in concentrate (M&C) ounces. Includes own mined production (-65%) and purchased concentrate (POC) volumes (-35%). Metal in concentrate production is impacted by lower grade and recoveries at Mogalakwena, planned infrastructure closures and lower volumes from Amandelbult. Kroondal switches to a tolling arrangement upon our exit from the operation, expected in 2024. Lower volumes in 2025 reflect the transition of the Siyanda POC agreement to tolling. 4. Production on a 100% basis except for the Gahcho Kué joint operation, which is on an attributable 51% basis, and is subject to trading conditions. Venetia continues to transition to underground operations - with first production recently achieved. 5. Total iron ore is the sum of Kumba and Minas-Rio on wet basis. 6. Production excludes thermal coal by-product. 7. 5E+ gold produced refined ounces. Includes own mined production and POC volumes. Kroondal switches to a tolling arrangement upon our exit from the operation, expected in 2024. Lower volumes in 2025 reflect the transition of the Siyanda POC agreement to tolling. Subject to the impact of Eskom load-curtailment. 8. Volumes are reported as wet metric tonnes (wmt). Product is shipped with -1.6% moisture. Production in 2023 is impacted by high levels of on-mine inventory and 2024 is subject to finalisation of UHDMS plant review. Subject to the third-party rail and port performance. 9. Volumes are reported as wet metric tonnes (wmt). Product is shipped with -9% moisture. Pipeline inspections impact 2020 and 2025 volumes. Anglo American 38
View entire presentation