Murphy West Uranium Project Overview
S
9700mN
The Nabarlek Deposit: Where it is all about the grade!!
9750mN
N
80mRL
Section
9725mN
Pre-mining surface
0.1/1
0.5/12.9
1.7/25
0.7/11
19/1.2
0.6/14.9
1.1/11
1.9/17
0.1/0.8
0.8/9.8
1.5/25
1.6/17.1
0.9/11
0.3/8
00.3/2
1.1/10.4
0.1/1.5
0.4/8.2
2.3/28.1
1.1/26
3.5/11
0.9/16.8
0.4/11.8
4.3/12
1.7/12
1.2/10.3
12.5/7.10
0.2/1.8
2.5/7.7
2.7/15.6
9.6/16
0.9/12.7 0.4/11.7
1.7/12
0.9/9.1 0.1/0.8
0.1/0.3
8.4/12.5
9.4/8.5
11.9/15
0.8/10.2
0.5/11.5
0.3/2.8
O 2.8/17.4
2.4/12
1.2/15.9
3.9/18.8
6.5/13.5
01.5/13.5
8.8/11
13.5/19.2
6.7/17.5
0.2/1
0.9/5.4
14/6.9 0.2/1
16.9/10.21
7.3/1.2
11.4/12.5
0.5/7.6
8.4/13.3
7.6/22.1
0.6/8.4
1.11/15.9
2.6/1.8
0.2/1
0.6/3.4
0.2/0.7
0.4/0.4
0.1/2.3
Cahill Formation
% U₂O, x metres
40mRL-
Pit outline (mined)
40mRL
Cahill Formation
NAD87
NAR140
10,100mE
NAR200
NAD052
NAD209
1.1%/11
0.6%/14.9
0.3%/8
Six Fault
2.7%/15.6
9.6%/16
13.5%/19.2
6.7%/17.5
NAD028
NAD193
10,140mE
NAD120
0.0%/2
0.2%/0.7
1.1%/15.9
0.2%/0.7
North Fault
0.7/1.5
25m
Dolerite
1-3
3-30
> 30
% U₂O /metres
Legend
Downhole Intercepts
%U₂Og/metres
North Fault
Nabarlek Shear
20m
Nabarlek Pit (North)
Long Section
Uranium Mineralisation defined by drilling in northern half of the Nabarlek Pit - now mined out.
•
Dolerite
Small High-Grade Footprint: Significant concentration of Uranium mineralisation mined from the pit
Strong Structural Control: Strong control to high-grade uranium mineralisation adjacent to the North Fault
Exploration Concepts: Lower grade margins emphasise the importance on uranium bearing structures
See ASX: DEV Announcement 9 October 2018.
NAD220
NAD003
NAD053
Pit outline (mined)
Nabarlek Uranium Mine
Section 9725 mN
6
NAD145View entire presentation