Murphy West Uranium Project Overview slide image

Murphy West Uranium Project Overview

S 9700mN The Nabarlek Deposit: Where it is all about the grade!! 9750mN N 80mRL Section 9725mN Pre-mining surface 0.1/1 0.5/12.9 1.7/25 0.7/11 19/1.2 0.6/14.9 1.1/11 1.9/17 0.1/0.8 0.8/9.8 1.5/25 1.6/17.1 0.9/11 0.3/8 00.3/2 1.1/10.4 0.1/1.5 0.4/8.2 2.3/28.1 1.1/26 3.5/11 0.9/16.8 0.4/11.8 4.3/12 1.7/12 1.2/10.3 12.5/7.10 0.2/1.8 2.5/7.7 2.7/15.6 9.6/16 0.9/12.7 0.4/11.7 1.7/12 0.9/9.1 0.1/0.8 0.1/0.3 8.4/12.5 9.4/8.5 11.9/15 0.8/10.2 0.5/11.5 0.3/2.8 O 2.8/17.4 2.4/12 1.2/15.9 3.9/18.8 6.5/13.5 01.5/13.5 8.8/11 13.5/19.2 6.7/17.5 0.2/1 0.9/5.4 14/6.9 0.2/1 16.9/10.21 7.3/1.2 11.4/12.5 0.5/7.6 8.4/13.3 7.6/22.1 0.6/8.4 1.11/15.9 2.6/1.8 0.2/1 0.6/3.4 0.2/0.7 0.4/0.4 0.1/2.3 Cahill Formation % U₂O, x metres 40mRL- Pit outline (mined) 40mRL Cahill Formation NAD87 NAR140 10,100mE NAR200 NAD052 NAD209 1.1%/11 0.6%/14.9 0.3%/8 Six Fault 2.7%/15.6 9.6%/16 13.5%/19.2 6.7%/17.5 NAD028 NAD193 10,140mE NAD120 0.0%/2 0.2%/0.7 1.1%/15.9 0.2%/0.7 North Fault 0.7/1.5 25m Dolerite 1-3 3-30 > 30 % U₂O /metres Legend Downhole Intercepts %U₂Og/metres North Fault Nabarlek Shear 20m Nabarlek Pit (North) Long Section Uranium Mineralisation defined by drilling in northern half of the Nabarlek Pit - now mined out. • Dolerite Small High-Grade Footprint: Significant concentration of Uranium mineralisation mined from the pit Strong Structural Control: Strong control to high-grade uranium mineralisation adjacent to the North Fault Exploration Concepts: Lower grade margins emphasise the importance on uranium bearing structures See ASX: DEV Announcement 9 October 2018. NAD220 NAD003 NAD053 Pit outline (mined) Nabarlek Uranium Mine Section 9725 mN 6 NAD145
View entire presentation