Australia Coal and Laos Power: Operational and Financial Summary
Power business: 2015 in review
CHINA
Mukawa
Luannan
Yabuki
(COD 2018)
7 MW
Awaji
(COD 2017)
100 MW, 128 tph*** 8.4 MWA
AC
AC
(COD 2018)
17 MW
Onami
AC
(COD 2018)
16 MWAC
Nari Aizu
(COD 2018)
20 MWAC
SLG
(COD 2017)
Zhengding
1,320 MW
73 MW, 370 tph
35 MW
LAOS
Hongsa
222
Zouping
(COD 2015-16)
100 MW, 450 tph
1,878 MW
222
THAILAND BLCP
1,434MW
Olympia
10MWAC
Hino
(COD 2016)
3.5 MWAC
JAPAN
Operational coal-fired
Developing coal fired
Operational solar
Developing solar
*Capacity based on 100% basis
**Power 100% capacity is derived from the 100% capacity of power and steam combined in MW equivalent
*** Steam
**** Chilled water
DEVELOPMENT & EXPANSION
BANPU
CHINA
.
BIC: Capacity expansion
of BIC to 546MWe** by 2020
• Zhengding: 67MWe**
expansion completed
• Shanxi Lu Guang :
approvals obtained
JAPAN
Japan Solar: secured
54MWAC equity, of which
50MWAC
is under
development
.
LAOS
⚫ Hongsa: COD first two units,
3rd unit scheduled for Mar
2016; 99% power dispatch
achieved
14View entire presentation