Investor Presentaiton slide image

Investor Presentaiton

4. OHRA-TAKAMINE AND KOWA • Comprehensive company data set over the main (3.5 km) mineralized corridor containing multiple veins and extensive alteration (detailed mapping, soil samples, prospect scale gravity and CSAMT geophysics) 3D modelling and integration undertaken to develop drill targets Fukuoka Hokusai кокушы Kyushu Hokusatsu Hishari Mine Map Location 2 km A Ohra-Takamine Project Ohra Mine: >28,000 ounces of gold produced, including 21,000 ounces mined at grades >20 g/t Au Takamine Mine: 1,600 ounces of gold produced at an average grade of 5.1 gt Au, 28.3 g/t Ag Yamada Mine. 7,000 tonnes of ore mined at average grade of 4-5 g/t Au and 1000 g/t Ag Aira Yamada Mine Urushi Mine: 13,000 ounces of gold produced at an average grade of 9.1 gt Au and 18.6 g/t Ag 父 Kowa Mine Workings Kowa Project 父 Matsuno Mine Production data referenced from: 1) Michitoshi, Miyahisa, 1967. Report of gold deposits survey in Takamine Ohra district, Kagoshima Prefecture, Association of Kagoshima Prefecture mineral resources development promotion 2) Gold Mines of Japan, 1989. The Mining & Materials Processing Institute of Japan. Legend Tenement Historic mine Gravity, soil, and CSAMT coverage Quartz vein Access road Contour Drainage MMAJ drill hole Japan Gold drill hole Drill proposal Quaternary sediment Volcanics Strike extension targets & follow up areas 21 Japan Gold Corp. | Corporate Presentation | December 2023 Year 1 Program . Drilling: 1 drill hole was completed and 3 drill holes are being considered to test vein targets between the historical Ohra and Takamine mines Generate drill targets at Matsuno Mine area and Kowa Project JAPAN GOLD CORP.
View entire presentation