Investor Presentaiton
4. OHRA-TAKAMINE AND KOWA
•
Comprehensive company data set over the main (3.5 km) mineralized corridor containing multiple
veins and extensive alteration (detailed mapping, soil samples, prospect scale gravity and CSAMT
geophysics)
3D modelling and integration undertaken to develop drill targets
Fukuoka
Hokusai
кокушы
Kyushu
Hokusatsu
Hishari Mine
Map Location
2 km A
Ohra-Takamine Project
Ohra Mine: >28,000 ounces of gold produced,
including 21,000 ounces mined
at grades >20 g/t Au
Takamine Mine: 1,600 ounces of gold
produced at an average grade of
5.1 gt Au, 28.3 g/t Ag
Yamada Mine. 7,000 tonnes of ore mined at
average grade of 4-5 g/t Au and 1000 g/t Ag
Aira Yamada Mine
Urushi Mine: 13,000 ounces of gold
produced at an average grade of
9.1 gt Au and 18.6 g/t Ag
父
Kowa Mine
Workings
Kowa Project
父
Matsuno Mine
Production data referenced from:
1) Michitoshi, Miyahisa, 1967. Report of gold deposits survey
in Takamine Ohra district, Kagoshima Prefecture,
Association of Kagoshima Prefecture mineral resources
development promotion
2) Gold Mines of Japan, 1989. The Mining & Materials Processing
Institute of Japan.
Legend
Tenement
Historic mine
Gravity, soil, and
CSAMT coverage
Quartz vein
Access road
Contour
Drainage
MMAJ drill hole
Japan Gold drill hole
Drill proposal
Quaternary sediment
Volcanics
Strike extension
targets & follow up
areas
21 Japan Gold Corp. | Corporate Presentation | December 2023
Year 1 Program
.
Drilling: 1 drill hole was
completed and 3 drill holes
are being considered to test
vein targets between the
historical Ohra and
Takamine mines
Generate drill targets at
Matsuno Mine area and
Kowa Project
JAPAN
GOLD
CORP.View entire presentation