CIVMEC INVESTOR PRESENTATION Q1 FY24
East Coast Facilities
Precast/Prestressed
Concrete Facility
Module Surface
Treatment Facility
Heavy Engineering
Workshop
CIVMEC INVESTOR PRESENTATION Q1 FY24
CIVMEC
Our east coast facility is strategically located on
227,000m² of land, just 14 kilometres from the
Port of Newcastle in New South Wales.
OVERVIEW
With direct access to the Hunter River, the site
offers 535m of prime river frontage, with two ship
basins.
The facility includes:
•
15,000m² heavy engineering workshop.
•
Offices
7,500m² precast/prestressed concrete facility.
Surface treatment facility.
Offices.
Serviced by 24 overhead cranes, the facility has
a single-lift capacity of 92 tonnes. The facility is
capable of producing a throughput of 35,000
tonnes of steel per annum and can accommodate
modules up to 22m wide and 136m in length.