Investor Presentaiton slide image

Investor Presentaiton

COPPER NORTH MINING CORP. Maximizing Metal Recovery TSX.V: COL Carmacks Copper-Gold-Silver Project Building Value ➤ Oxide deposit grades 1.07% Cu, 0.45 g/t Au, and 4.5 g/t Ag (Zones, 1, 4, 7, and 7A) Historical plan was to heap leach and only recover copper ➤ Selected two-stage agitated tank leach process expected to efficiently recover copper by sulphuric acid leach and precious metals by cyanide leach JDS Energy and Mining. 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada, filed on www.sedar.com on 9 February 2017. The 2017 PEA is preliminary in nature and there is no certainty that the PEA findings will be realized. ➤ Leached copper would be recovered by SX/EW to produce LME grade A copper cathode ➤ Leached gold and silver would be recovered by carbon-in-leach Near 100% recovery of acid-soluble copper and cyanide-leachable gold estimated from locked cycle testing Maximizing Metal Recovery | 10
View entire presentation