Investor Presentaiton
146,500mN
147,000mN
147.500mN
Banesa Au-Cu Project - EL609 - historic drilling
St Barbara
LIMITED
48,000mE
48,500mE
49,000mE
N
47,500mE
TABAR ISLAND - EL609
BANESA
Historical Drill
Results
BA001:
0
250
metres
Tabar Island Grid (TIG05)
BND2:
22m @ 0.3% Cu &
1.6 g/t Au from 54m
37m@ 0.6 g/t Au from 89m
25m @ 0.8 g/t Au from 226m
incl 6m @ 1.2 g/t from 244m
BND7:
18m @ 0.4% Cu &
1.4 g/t Au from 398m
Drillhole significant intercept
IP Lines
Creeks
-
Interpreted Faults
Biotite Diorite
Equigranular Diorite
BND6:
77m @ 0.9% Cu &
0.5 g/t Au from 62m
BND5:
69m @ 1.1% Cu &
0.8 g/t Au from 50m
St Barbara
Hornblende Diorite
Agglomerate
Polymict Breccia
Pyroxene Porphyry
Undifferentiated Diorite
47,500mE
48,000mE
48,500mE
Simberi Operations
49,000mE
147,500mN
147,000mN
146,500mN
Banesa Porphyry Au-Cu Project:
•
-
1996 – Nord completed 1 diamond
hole BA001 for 384m¹
2009 Barrick Gold completed 6
diamond holes (BND2 to BND7) for
2,625m¹
Intersected Au-Cu alkaline porphyry
style mineralisation
Best Intersection: 69m at 0.8 g/t gold
and 1.1% copper from 50m in BND52
2013 IP geophysics survey
2015 extensive (~9 line km)
mapping, trenching and 3D modelling
in preparation for potential drilling
52/
Asia Investor Relations Roadshow / March 2016
1. Allied Gold Limited Prospectus, 20 June 2011
2. Allied Gold Annual Report 2009View entire presentation