Investor Presentaiton slide image

Investor Presentaiton

146,500mN 147,000mN 147.500mN Banesa Au-Cu Project - EL609 - historic drilling St Barbara LIMITED 48,000mE 48,500mE 49,000mE N 47,500mE TABAR ISLAND - EL609 BANESA Historical Drill Results BA001: 0 250 metres Tabar Island Grid (TIG05) BND2: 22m @ 0.3% Cu & 1.6 g/t Au from 54m 37m@ 0.6 g/t Au from 89m 25m @ 0.8 g/t Au from 226m incl 6m @ 1.2 g/t from 244m BND7: 18m @ 0.4% Cu & 1.4 g/t Au from 398m Drillhole significant intercept IP Lines Creeks - Interpreted Faults Biotite Diorite Equigranular Diorite BND6: 77m @ 0.9% Cu & 0.5 g/t Au from 62m BND5: 69m @ 1.1% Cu & 0.8 g/t Au from 50m St Barbara Hornblende Diorite Agglomerate Polymict Breccia Pyroxene Porphyry Undifferentiated Diorite 47,500mE 48,000mE 48,500mE Simberi Operations 49,000mE 147,500mN 147,000mN 146,500mN Banesa Porphyry Au-Cu Project: • - 1996 – Nord completed 1 diamond hole BA001 for 384m¹ 2009 Barrick Gold completed 6 diamond holes (BND2 to BND7) for 2,625m¹ Intersected Au-Cu alkaline porphyry style mineralisation Best Intersection: 69m at 0.8 g/t gold and 1.1% copper from 50m in BND52 2013 IP geophysics survey 2015 extensive (~9 line km) mapping, trenching and 3D modelling in preparation for potential drilling 52/ Asia Investor Relations Roadshow / March 2016 1. Allied Gold Limited Prospectus, 20 June 2011 2. Allied Gold Annual Report 2009
View entire presentation