Southeast Asia FPV Study: Technical Potential Calculation Exclusions* Waterbodies in protected areas are excluded. FPV Technical Potential: Suitable Area (km²) + Technology Assumptions Waterbodies further than 50km from the nearest major road are excluded. + Sensitivities Minimum distances from shore: 0m, 50 m, and 100 m Maximum distances from shore: 500 m, 1000 m, and 2000 m FPV Technical Potential: Capacity (GW) PVWatts *A distance-from-transmission exclusion was included for certain results, but not the default results, because this data was only available for certain countries (Cambodia, Laos, Myanmar, the Philippines, Thailand, and Vietnam). Solar Resource Data FPV Technical Potential: Generation (TWh/yr) System Advisor Model Source: Joshi et al. (2023b) NREL 20