Eos Energy Results Presentation Deck slide image

Eos Energy Results Presentation Deck

Operational Scale & Capacity State-of-the-Art Manufacturing Line Update Station fabrication, process development, and debugging over 30 discrete processes 9 Conceptual Design Integrator evaluations / selection Conceptual design review āœ“ Part Presentation Feasibility Study Design for manufacturing the time. ACRO Sub-contractor selection āœ“ Detailed Design Mechanical design Controls engineering Bi-polar Insertion 2 FANUC Robot SR-12/A Factory Acceptance Station assembly and integration Mechanical & controls debugging O Site Acceptance 3 Disassemble and ship to Eos factory Final debugging and commissioning Battery Unload ur Beginning to build out full assembly layout inside Acro's facility in Wisconsin av LAST ACRO MADE IN V.S.A. Line 1 Annualized Capacity: -1.25 GWh Investment -1.25 GWh, $30M Includes: Automated Battery Assembly Injection Molding Tools 2+ GWh, Incremental ~$10 - $20M Includes: Terminal / Bi-polar Automation (Supports 2 lines) Final Assembly Automation (Supports 2 lines) Injection Molding Tools On budget and expected commissioning in Q2 2024
View entire presentation