Metals Acquisition Corp SPAC Presentation Deck slide image

Metals Acquisition Corp SPAC Presentation Deck

→ 2 Significant Near-Mine Resource Upside Lower Cut-off Could Add Material Production and Mine Life to CSA • Historical resource cut-off grade materially above profitable mines operating in close proximity to CSA • Tritton Mine (Aeris) and Peak Mine (Aurelia) have a Cu resource grade of 1.2% - 1.8% vs CSA resource grade of 5.6% and cut-off of 2.5% • Potential to add material tonnes to the CSA mining inventory and optimize processing plant utilization Processing plant has a throughput capacity potential of 1.5Mtpa(1) vs current operating rate of 1.3Mtpa(2) Underground Copper Mines in Australia (³) (Reserve Grade % Cu) 5 4 32 2 1 DeGrussa CSA Eloise CSA's 2.5% cut-off resource grade is above the current reserve grade for all underground copper mines in Australia (excluding DeGrussa(4)) Mount Isa Copper Capricorn Copper Tritton CSA Cut Off Grade: 2.5% Carrapateena Ernest Henry Prominent Hill Northparkes Sources: Company Information, SRK and Wood Mackenzie 2021. (1) Estimated throughput capacity potential based on the Independent Technical assessment by SRK (2) Based on realized production rates for 4Q CY2021; (3) Underground copper mines in Australia, Canada and USA producing less than 100kipa payable copper; (4) Expected to be phased out by end of 2022. 19
View entire presentation