Investor Presentation slide image

Investor Presentation

2-A NEW PLATFORM: USA & SOFOS-HARBERT US Gov expects an increase of Solar PV deployments from current 67GW to 1.000GW in 2035*. Total pipeline 1.8 GW Grenergy renovables Regional power grids Track record of PJM MISO SOUTH (Midwest) > 560 MW Connected or RTB SOUTHEAST PJM (Mid-Atlantic) MISO SOUTH (Midwest) SOUTHEAST * Data Source: taken from Solar Future Study released by the U.S Department of Energy in September 2021. MW SOFOS-HARBERT AT A GLANCE Solid structure > 20 Employees Storage C. 600 MWh Under Dev. āœ“ Grenergy holds 40% of SHRE and a call option to reach 100% in the next three-year period. USA Solar Pipeline 1,882 PPA origination 1,008 454 420 Total Pipeline Advanced Dev. Early Stage Identified Opport. 10
View entire presentation