Ocado Results Presentation Deck slide image

Ocado Results Presentation Deck

Resetting the bar in online grocery: today versus tomorrow Targeting step changes in capital and operating costs, for partners and Ocado Group Productivity Flexibility Operational performance indicators Direct labour cost in a site (£m) Robotic site mature productivity (UPH) Time for installation and testing of MHE (months)¹ Share of orders delivered <4hrs from order placed ¹,2 Today variable 200 10 <10% Ocado Re: Imagined 2024 target >30% lower 300+ 5 >50% Clients ordering a CFC today for delivery in 2H23 will have the following features enabled: 600 Series bots; 600 grid and Optimised Site Design; Automated Frameload; On-grid Robotic Pick; Ocado Swift Router; and Ocado Flex. Orders made prior to the launch of Ocado Re:Imagined for delivery at the end of FY23 can be retrofitted to include many of these enhancements. Note: (1) for a standard 6 module CFC (2) lead times are dependent on both the location of CFC relative to its first delivery location ('stem' distance' as well as density within a given delivery area. Short lead time route efficiency can be comparable to current next day delivery efficiency where density is high. High density is defined as a location with 5-10+ orders per week per square kilometre Ⓒ2021 Ocado Group plc. All rights reserved. 29
View entire presentation