Gatos Silver Investor Presentation Deck slide image

Gatos Silver Investor Presentation Deck

2023 LOM Plan - Production Schedule and Operating Costs Milling throughput rates average ~2,950 tpd + Throughput rate is supported by recent operating performance LOM Plan averages ~2,950 tpd ▪ H1 2023 rates at 2,905 tpd ■ + Operating costs based on recent performance Proportion of lower cost longhole stoping method increases over the mine life ▪ Sensitive to exchange rates ● ~$2.50 / tonne milled per 1 MXN / USD rate change + Initiatives already started to further improve productivity and costs beyond LOM assumptions ▪ Maintenance and equipment utilization ▪ Backfill optimization Mill throughput and silver head grades Throughput Mill Throughput (tpd) 3,000 2,800 2,600 2,400 2,200 2,000 1,800 1,600 Zinc Grade Lead Grade 2,928 271 H2 2023 $26.64 2,957 $17.90 267 2024 4.51% 4.75% 2.11% 2.14% 2,957 $88.67 per tonne milled 268 2025 2,962 $44.14 223 2026 4.56% 4.89% 2.22% 2.33% 2,984 193 2027 Continued focus on cost reduction opportunities LOM Operating Costs 4.56% 2.26% ■ Mining Costs Silver Grade 2,970 ■ Milling Costs ■ G&A Costs 201 2,978 171 2028 3.68% 3.69% 2.03% 2.17% 2029 GATOS SILVER 2,844 165 2030 4.08% 2.34% 300 250 200 150 100 50 0 Silver Head Grade (g/t) 25
View entire presentation