Fresnillo Results Presentation Deck slide image

Fresnillo Results Presentation Deck

2022 PRELIMINARY RESULTS OPERATIONS JUANICIPIO (JV WITH MAG SILVER. FRESNILLO: 56%) - A KEY ACTIONS 14 Completed the tie in of the flotation plant to the national grid Despite the delay, mineralised material from development and initial production stopes was processed at the Fresnillo and Saucito beneficiation plants during the year Development of the mine continued to advance, reaching almost 58km by the end of the year Commissioning and tests with low ore grade material are underway Ramp up of production expected to progress smoothly, with the objective of achieving nameplate capacity by 3Q23 Once at full capacity, the average silver ore grade is expected to be around 400 g/t, with the gold ore grade expected to average 1.0 g/t