AngloAmerican Results Presentation Deck slide image

AngloAmerican Results Presentation Deck

TECHNOLOGY & INNOVATION WILL TRANSFORM THE PHYSICAL FOOTPRINT OF MINING $0.2-0.5bn pa technology capex to more precisely target metal & mineral with less water, waste & energy Application Initiative Bulk ore sorting Coarse particle recovery (CPR) Smart power hydrogen trucks Hydraulic dry stack Anglo American Copper, PGMs & Nickel Copper, PGMs & Iron Ore Portfolio-wide Copper, PGMs & Iron Ore Impact Deliver improved feed grade to plants through early rejection of waste, improving energy efficiencies Innovative flotation process allows material to be crushed to a larger particle size, rejecting coarse gangue and allowing water to release from coarser ore particles, improving energy efficiencies and water savings Developing the world's first hydrogen powered mining truck to decarbonise high power transport, using renewable energy Engineering of geotechnically stable tailings facilities that dry out in weeks, facilitating up to 85% water recovery Progress Full scale testing underway at El Soldado (Copper) Testing complete at Mogalakwena (PGMs). Commissioning of full scale North Concentrator unit in Q1 2021 (~70% of feed) Testing complete at Barro Alto (Nickel). $40m capex to scale up to 100% throughput through 2021-22 Initial installation & testing at Los Bronces (Copper) during 2021. $10m capex for initial deployment (up to -60% of throughput). Phase 2 study work under way ● ● ● ● ● ● Full scale demo plant installed at El Soldado (Copper) with ramp up to full capacity expected by mid 2021 Full scale system under construction at Mogalakwena North concentrator (PGMS). Commissioning expected Q4 2021 CPR approved at Quellaveco (Copper) to re-treat coarse particles from flotation tailings, improving recoveries by ~3% over the life of mine. Commissioning expected in 2022 Feasibility work continues at Los Bronces (Copper) & Minas-Rio (Iron Ore) Engineering under way with first motion at Mogalakwena (PGMs) in 2021, with 40 truck roll-out starting 2024, powered by a 75Mw solar plant on site. Targeting roll-out at 7 sites by 2030 El Soldado (Copper) unit under construction, due to complete in Q3 2021 Sequencing and application of future roll-outs to be determined 49
View entire presentation