Endeavour Mining Investor Presentation Deck slide image

Endeavour Mining Investor Presentation Deck

O KALANA PROJECT Mali > Key changes in updated PFS compared to the 2016 Avnel study: - Mill capacity increased by 150% from 1.2 to 3.0Mtpa, with upfront capital increased by 51% 2016 study included pre-production revenue from the tailings processed during construction, which were removed within the 2021 study Average annual production increased by 49% from 101 to 150kozpa, while shortening the mine life from 18 to 11 years AISC increased by 15% to $901/oz reflecting updated unit costs and the lower grades Average processed grade decreased by 43%, tonnage processed increased by 63%, and the strip ratio decreased by 34% The updated MRE includes the Kalana and Kalanako deposits and two TSFs stemming from the historical underground mine. The deposit's geological models were updated using a more conservative approach to incorporate tighter geological controls for the high-grade nugget effect, stacked vein sets and dilution ENDEAVOUR MINING Kalana 2016 vs. 2021 Study Comparison¹ PLANT SIZE & CAPEX Nominal mill capacity, Mtpa Upfront capital cost, $m LIFE OF MINE STATS Mine life, years Strip ratio, W:0 Tonnes processed, Mt Grade processed, Au g/t Gold contained processed, Moz Average recovery rate, % Total gold production, Moz Average annual production, kozpa AISC, $/oz 2021 Kalana PFS Project Economics Gold Price PRE-TAX NPV5 $m 5%' IRR, % Payback years AFTER-TAX NPV5%, $m IRR, % Payback years $1,350/oz 310 44 1.4 204 36 1.5 $1,500/oz 498 59 1.1 2021 STUDY 331 49 1.1 3.0 297 11 6.7 35.6 1.60 1.8 90 1.7 150 901 2016 STUDY 1.2 196 18 10.2 21.8 2.81 2.0 93 1.8 101 784 $1,650/oz 687 74 0.9 458 62 0.9 VARIANCE +150% +51% -39% -34% +63% -43% -9% -3% -8% +49% +15% $1,800/oz 875 88 0.8 584 74 0.8 1. Details related to the Avnel 2016 Study, published on March 30, 2016, are available on SEDAR under Avnel's profile. Comparative period economics are unavailable as a gold price of US$1,200/oz was used in the 2016 Study while $1,500/oz was used in the 2021 Study. Mineral Reserve and Resource estimates follow the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") definitions standards for Mineral Resources and Reserves and have been completed in accordance with the Standards of Disclosure for Mineral Projects as defined by National Instrument 43-101. Reported tonnage and grade figures have been rounded from raw estimates to reflect the relative accuracy of the estimate. Minor variations may occur during the addition of rounded numbers. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The 2020 Updated Kalana Project Mineral Resource has an effective date of June 30, 2020 and is constrained by a $1,500/oz conceptual open-pit shell. For notes relating to the 2020 Resource Estimate, please consult the section below entitled Kalana Technical Notes. As per Avnel Mineral Resources as of March 30, 2016, based on $1,400/oz Au; for the notes relating to the 2016 estimate, please consult the Kalana Technical Report dated March 30, 2016 available on the Endeavour website. 104
View entire presentation