Fresnillo Results Presentation Deck
2021 PRELIMINARY RESULTS
SAN JULIÁN (VEIN SYSTEM)
KEY OPERATING HIGHLIGHTS
Gold production - koz
Silver production moz
Cash cost US$/oz of Ag
AISC - US$/oz of Ag
Reserves 2021 *
Resources 2021
Silver grade in reserve
2021 SUMMARY
Higher than expected ore grade at the DOB
Operational continuity of the DOB mine was
maintained, with no geotechnical issues detected
●
●
*
• Semi-autonomous drilling represented 63% of the
total metres drilled during the year, versus 41% in
2020
*As of 31 May 2021
OPERATIONS
SAN JULIÁN (DISSEMINATED ORE BODY)
2021
2020 KEY OPERATING HIGHLIGHTS
51.8
61.8 Gold production - koz
4.2
4.0
Silver production - moz
1.8
(6.0)
Cash cost US$/oz of Ag
14.0
AISCUS$/oz of Ag
5.0
41.6 moz Ag, 293 koz Au
Reserves 2021 *
122.9 moz Ag, 1,040 koz Au
244 g/t
Resources 2021
Silver grade in reserve
204 g/t
• Lower volume of ore processed driven by two
electricity outages during the year
2022 PRIORITIES
• Maintain strict safety protocols
Mitigate the impact of the labour
reform
●
●
Continue exploration in the
region, targeting a similar
disseminated ore body
2021
2020
3.1
9.3
7.0
8.9
33.0 moz Ag, 18 koz Au
64.2 moz Ag, 38 koz Au
162 g/t
167 g/t
40
4.0
12.5
4.8
6.3
• Conclude a pilot project to
confirm the feasibility for the
extraction of ore panels under
paste fill.
Begin the construction of the
third phase of the tailings damView entire presentation