Vale Investor Presentation Deck
D
Maximize flight to quality in Iron Ore
Implementing solutions for a sustainable mining
Ore processing method
40%
60%
2015
58%
42%
2018
69%
16%
1%
14%
400 Mtpy
production ¹
Dry processing (no dams)
Dry concentration (no dams)
Filtration and dry stacking2 (marginal use of dams)
Wet processing³ (with dams)
70% dry processing by 2024
Filtering: US$ 2.3 billion will be
invested between 2020-2025
Dry concentration: US$ 125 million
(Capex) in New Steel
Co-products: tailings as input for the
civil construction industry
1 After the Usina 1, located in Serra Norte, conversion to dry processing. 2 The processing method is wet processing and tailings are filtered and dry stacked. The processing method is wet processing and tailings are filtered and dry stacked.