16 1 Reparation, People & Safety Making progress with dam safety Structures at risk¹ (unit) 35 4 7 24 33 2020² ထ 31 336 22 9 4 5 Jan-21 Dec-25E No dam at critical safety condition by 2025 22 Nov-21³ Emergency level² Level 3 Level 2 Level 1 Level 3 Higher liquefaction risk and back-up dams built downstream Level 2 Anomalies identified which require actions Level 1 Anomalies which demand more information, monitoring or attention ¹ Includes dams, dikes and drained stacks. As per the Brazilian regulation and as provided for in each Mining Dams Emergency Action Plan, considering level 3 as the critical emergency level. 2 Considering the maximum number of structures at emergency level in 2020. 3 The 31 structures encompass different heightening methods and include 11 upstream structures. VALE