Proterra Investor Presentation Deck
Scalable, Capital Efficient Manufacturing
Enables Rapid Expansion in Capacity
BURLINGAME, CA
●
Dedicated to Proterra
Powered vehicle
batteries
Integrated R&D and
testing center
Start of production:
2017
CITY OF INDUSTRY, CA
© 2022 Proterra. All Rights Reserved.
Integrated bus and
battery facility
Each built in <12 months
for <$20 million
50K sq. ft. per GWh of
battery capacity
Start of production:
Bus 2017/ Battery 2020
BATTERY
MANUFACTURING
Annual battery capacity¹:
O
GREENVILLE, SC
●
Flagship bus
manufacturing facility
Drivetrain and high-
voltage junction box
production
Start of production:
2011
POWERED 1
(GREER, SC)
Next-generation
battery facility
• Drivetrain and
●
ancillary component
production
• Start of production
estimated in Q4 2022
www
1. Based on capacity of manufacturing equipment installed and does not take into account labor
~1 GWh operational in Q3 2022
Multiple GWh targeted in Q4 2022
AS & F
PROTEST
PROTERRA
17View entire presentation