AngloAmerican Results Presentation Deck
Developing a larger, scalable operation
Sandstone
Woodsmith Mine Ladycross Plantation
(Whitby)
access shaft
Ventilation
Mudstone / Shales
Polyhalite seam
MTS
Shaft
Service
shaft
Mineral Transport System (MTS)
Upgraded conveyor
Production
shaft
Lockwood Beck
access shaft
ALTRO
Materials Handling Facility
(Wilton)
Mine
Granulation capacity
Not to scale. Graphic and information is illustrative only
as studies are ongoing and subject to Board approval.
Shafts
Underground conveyor
Processing & port facilities
Port Facility
(Redcar Bulk Terminal)
Bran Sands expansion
1,600m access and hoisting shafts
Mechanised underground operation
Potential to phase ventilation and
production level development
37km underground tunnel
Potential to phase conveyor upgrades
Materials Handling Facility
Priority access export facilities
Phased expansion as required
30View entire presentation