Vale Investor Day Presentation Deck
Core Shed
Hu'u project, Indonesia
10 021212
19-224
A
17
M
32
PHO
3665-390-80
COK
1480 42065-423-30 160
30-833-20
ww
DUK
149 42330-425-95
THO
04 342-346-60
VPD
107 346-399-20
107 404.7
BUX
Box
150
Box
151 41815-430-90
150425-45-428-25
N
BOK
97 402 F 404 75 153 433 45-436-10
Buxit
154 K
HD
7 342 402-45 15243090-433-45
407-30
47 473-409-95
BOK
156
BOX
161
43610-438-65
BOK
44155-444-10
BOX
438-65-491-55
вож
165
163
Bax
164
BOK
168
4
Developing a world-class
copper discovery: Hu'u Project
$
Cu
Base Metals Transformation
15
Completion of the assessment of alternatives for the
pre-feasibility study¹
Onto deposit estimated to contain 17.4 Mt of copper and
32 Moz of gold in resources². Equates to an increase of
~15% in contained copper since February 2020³
Copper production estimated at 300-350 ktpy during peak
production with a predicted mine life of >45 years
Expect to conclude the pre-feasibility study in 2024
Note: Hu'u is 100% owned by PT Sumbawa Timur Mining (STM), an Indonesian private joint-venture
company owned by Eastern Star Resources Pty Ltd (80%) and PT Aneka Tambang (20%). Eastern Star
Resources Pty Ltd is 100% owned by Vale. ¹ Delivered an Assessment of Alternatives for the planned
Final Pre-feasibility Study. At this time, a block cave mine with conventional mill & flotation circuit and
associated infrastructure will be further studied in the final phase of the pre-feasibility study. 21.1Bt
Indicated Resources @ 0.96% Cu and 0.58g/t Au containing 10 Mt Cu and 20 Moz Au and 1.0Bt
Inferred Resources @ 0.74% Cu and 0.37g/t Au containing 7.4 Mt Cu nd 12 MoztAu. ³ Mineral
Resource Estimate Statement (19 February 2020)
VALEView entire presentation