Fresnillo Results Presentation Deck
2021 PRELIMINARY RESULTS - OPERATIONS
HERRADURA
2021 SUMMARY
• As the scope of the Carbon in Column
project increased, construction will be
finished in mid-2022
●
Concluded the conversion of our haulage
fleet to the dual fuel system
Construction of the 14th leaching pad was
concluded
• Several initiatives to reduce dust at
loading bays were implemented
.
Despite the implementation of the labour
reform, utilisation rates of our haulage
fleet increased
* As of 31 May 2021
TTI
2022 PRIORITIES
• Maintain strict safety protocols
Commission and ramp up the Carbon in
Column project
Begin to implement recommendations
from the pit slope optimisation study
Advance the construction of the 15th
leaching pad
KEY OPERATING HIGHLIGHTS
Silver production - moz
Gold production - koz
Cash cost - US$/oz of Au
AISC - US$/oz of Au
Reserves 2021 *
Resources 2021
Gold grade in reserve
2021
0.9
421.5
900.4
1,100.2
0.73 g/t
42
2020
1.3
425.3
727.9
881.9
5,638 koz Au
7,597 koz Au
0.76 g/tView entire presentation