Fresnillo Results Presentation Deck slide image

Fresnillo Results Presentation Deck

2021 PRELIMINARY RESULTS - OPERATIONS HERRADURA 2021 SUMMARY • As the scope of the Carbon in Column project increased, construction will be finished in mid-2022 ● Concluded the conversion of our haulage fleet to the dual fuel system Construction of the 14th leaching pad was concluded • Several initiatives to reduce dust at loading bays were implemented . Despite the implementation of the labour reform, utilisation rates of our haulage fleet increased * As of 31 May 2021 TTI 2022 PRIORITIES • Maintain strict safety protocols Commission and ramp up the Carbon in Column project Begin to implement recommendations from the pit slope optimisation study Advance the construction of the 15th leaching pad KEY OPERATING HIGHLIGHTS Silver production - moz Gold production - koz Cash cost - US$/oz of Au AISC - US$/oz of Au Reserves 2021 * Resources 2021 Gold grade in reserve 2021 0.9 421.5 900.4 1,100.2 0.73 g/t 42 2020 1.3 425.3 727.9 881.9 5,638 koz Au 7,597 koz Au 0.76 g/t
View entire presentation