1.9 GWac Solar Portfolio Operational Bridge Actual vs. Technical Estimates Actual vs. Estimated Quarterly CUF for 1.9 GW AC Portfolio Target CUF 28.00% 26.00% 24.00% 25.55% 25.31% 22.00% Actual 20.00% Q1 FY20 21.44% Q2 FY20 23.59% Q3 FY20 Annual CUF Target for existing Solar capacity of 1948 MW is ~24.5% 27.54% Q4 FY20 adani Renewables 30.00% Solar Portfolio: 1948MW ac for Q1 FY20 29.00% 28.00% P75@ 27.00% + 24.37% 26.00% 25.55% 0.82% 25.31% P90@ 25.00% -0.23% -0.13% -0.22% 23.31% -0.47% 24.00% 23.00% 22.00% 21.00% 20.00% P50 CUF Full Ramp Up (DC) Grid Unavailability AGEL solar portfolio operating near P50 levels Radiation Gain Plant Unavailability Others CUF Actual Note: P50 targets based on internal estimates 29