Adani Green Energy Limited
1.9 GWac Solar Portfolio Operational Bridge
Actual vs. Technical Estimates
Actual vs. Estimated Quarterly CUF for 1.9 GW AC Portfolio
Target CUF
28.00%
26.00%
24.00%
25.55%
25.31%
22.00%
Actual
20.00%
Q1 FY20
21.44%
Q2 FY20
23.59%
Q3 FY20
Annual CUF Target for existing Solar capacity of 1948 MW is ~24.5%
27.54%
Q4 FY20
adani
Renewables
30.00%
Solar Portfolio: 1948MW ac for Q1 FY20
29.00%
28.00%
P75@
27.00%
+
24.37% 26.00%
25.55%
0.82%
25.31%
P90@ 25.00%
-0.23%
-0.13%
-0.22%
23.31%
-0.47%
24.00%
23.00%
22.00%
21.00%
20.00%
P50 CUF
Full Ramp Up (DC)
Grid
Unavailability
AGEL solar portfolio operating near P50 levels
Radiation Gain
Plant
Unavailability
Others
CUF Actual
Note: P50 targets based on internal estimates