Endeavour Mining Investor Presentation Deck
KEY OPPORTUNITIES
●
●
●
ITY MINE
Côte D'Ivoire
Commencement of processing ore from Le Plaque and continued
inclusion of new discoveries to provide greater mining and
processing flexibility
Constructing a recyanidation circuit to lower costs and improve
recovery rates
PRODUCTION AND AI
$906/oz
Exploring plant optimisations levers including increasing front end
capacity to reduce operating costs and increase throughput capacity
59koz
2017A
$719/oz
MINING
85koz
2018A
ENDEAVOUR
190koz
$616/oz
2019A
AISC ($/oz)
213koz
$807/oz
2020A
AK
272koz
Production (koz)
$836/oz
COO video presentation
2021A
255-270koz
$850 -
900/oz
2022E
Resources shown
inclusive of Reserves (on a 100% basis)
Proven Reserves
Probable Reserves
Website
RESERVES AND RESOURCES AS AT DEC. 31, 2021
P&P Reserves
Measured Resource (incl. reserves)
Indicated Resources (incl. reserves)
M&I Resources (incl. reserves)
Inferred Resources
2021 EMISSIONS INTENSITY
kgCO2eq/oz produced
Ity
Endeavour
Industry
Average¹
A
430
540
Latest technical report
900
Tonnage
(Mt)
11.9
51.2
63.0
12.1
77.3
89.5
27.1
Ity
kgCO2eq/t processed
Endeavour
Industry average
(open pit)²
Grade
(Au g/t)
3D mine site tour
(1) 2020 and 2021 weighted average GHG emissions intensity (Scope 1 & 2). S&P Global, Company Filings. (2) 2019 industry average, S&P Global, Company Filings.
0.89
1.61
1.47
0.88
1.66
1.56
1.47
19
Content
(Au koz)
338
2,641
2,979
344
4,131
4,475
1,279
32
25
60View entire presentation