AngloAmerican Results Presentation Deck
METALLURGICAL COAL - A CHALLENGING YEAR
Metallurgical Metallurgical FOB realised
production¹
sales 1
price²
16.8Mt
16.9Mt
$109/t
2020
vs. 2019
Underlying EBITDA ($m)
1,707
2019
(789)
Price
126%
Anglo American
-2-
(11) (10)
FX Inflation Covid
125%
899
(755)
134%
(88)
Operational Cost &
incidents volume
50
(6) -
Other 2020
1. Excludes thermal coal.
2.
Weighted average HCC and PCI realised price at managed operations. Excludes thermal coal.
FOB unit cost at managed operations excluding royalties and study costs.
3.
4. Includes corporate and projects costs of $74m.
Unit cost³
$86/t
137%
Underlying
EBITDA4
$50m
●
197%
●
Mining
margin
3%
142pp
Capex
$683m
Grosvenor restart
• Queensland Coal Mining Board of Inquiry began hearings
in 2020 & delivered a preliminary report on 30 November
2020
12%
• Hearings will resume on 9 March 2021
●
• Final report expected by 31 May 2021
In parallel to our full cooperation with the Board of Inquiry,
preparations for a H2 2021 restart are under way:
Learnings are being incorporated into enhanced
processes & controls
A new longwall has been procured & is available for
installation from June 2021
Works to permanently seal off the affected longwall
panel are complete
Following regulatory clearance to re-enter the mine,
safety and compliance inspections will take place,
followed by development work & installation of the new
longwall, with various regulatory approvals required
62View entire presentation