Vale ESG Presentation Deck slide image

Vale ESG Presentation Deck

Progress with TDMS and the Decharacterization Program Tailings & Dams Management System Routine ■ ■ ■ New dam management policy Responsibility assignment matrix revised ■ 25 requirements and guidelines Periodic assessment by the assurance team Performance 100% of dams¹ with Engineer of Record Continuous monitoring and inspections Periodic and immediate reports to upper management Risk assessment 100% tailings dam portfolio covered by risk assessment (HIRA) by the end of 2022 Rigorous enforcement of updated emergency level requirements ¹In Brazil. ²Same raising method deployed at B1 dam, collapsed in Brumadinho. ³Includes dams, dikes and waste piles. Upstream² Dam³ Decharacterization Program ■ ■ ■ ■ 6 upstream dam eliminated since 2019 24 upstream dam to eliminate: Emergency # of level dams 3 3 2 4 1 4 Back-up dams for all level-3 dams No dam at emergency level 3 by 2025 Program's completion by 2029 VALE
View entire presentation