NHPC Capacity Addition and Financial Overview
NHPC - Projects in Operation... contd.
Renewable Energy
एनएचपीसी
NHPC
27
S.No
Project
(MW)
Installed Design
Capacity Energy
(MU)
Capital Cost
Year of
Comm.
as on
31.03.2023
Tariff 22-23
(Rs./unit)
Place of Project
Wind Power
50
94.25
2016
330.40
3.67
Lakhmana, Jaisalmer
2
Solar Power
50
105.96
2018
290.59
4.41
Theni/Dindigul District, Tamilnadu
Total-B
100
200.21
620.99
5551
24801.58
40437.84
3.87
Sub Total Stand-alone(A+B)
Operational Projects with Subsidiary
Installed
S.No
Project
Capacity
Design
Energy
Year of
Comm.
Capital Cost as
on 31.03.2023
Tariff 18-19
(Rs./kwh)*
Type of the project
(MW)
(MU)
1
Indrasagar, (8x125)
1000
1423.26
2005
5326.43
3.80
Storage
Madhya Pradesh
2
Omkareshwar,
520
736.46
2007
3138.08
4.62
Storage
(8x65)
Madhya Pradesh
Total-C
1520
2159.72
8464.51
4.08
*Tariff for 2019-20, 2020-21 and
2021-22 yet to be notified.
Grand Total-
7071
26961.27
D:(A+B+C)View entire presentation