Waste management GRI 306-1, 306-2
In general, the waste resulting from our energy-generating
activity comes from the maintenance of equipment and
generating systems, offices and administrative activities.
Our asset operation is guided by a Waste Management Plan
(PGR), which determines the guidelines for proper handling,
packaging, storage and final disposal suitable for each type of
waste generated. All contractors involved in this process are
licensed for this activity. The PGR also includes the guidelines
set by ISO 14001, in which our assets HPP São Simão, Complexo
Eólico Vale dos Ventos and Parque Eólico Millenium are certified.
DEPOSITO DE
RESÍDUOS
At HPP São Simão, waste is separated and classified. Recyclable
materials are sent to a cooperative in Santa Vitória (Minas Gerais),
where organic and non-reusable waste is also sent, deposited
in a licensed landfill. Sludge from the ETE, septic tanks and
biodigesters, and hazardous waste resulting from maintenance
are collected by specialized firms and directed to treatment and
proper disposal.
In 2022, we recorded significant generation of construction
waste resulting from the demobilization of structures around the
reservoir of the plant due to the resumption of repossession suits.
We also carried out the handling of waste from the operation and
modernization of HPP São Simão, generated by the replacement
of large equipment and structures. In total, about 121,300 tons of
scrap metal were sent for reuse. The collection, transportation and
recycling processes of scrap and insulating oil resulting from the
modernization project are audited by Ernst & Young to verify the
final destination. The insulating oil was sent for co-processing due
to the type of treatment offered by the contractor for the service.
Our asset operation follows
the Waste Management