Investor Presentaiton slide image

Investor Presentaiton

3. Resilient Infrastructure: The Strategy Infrastructure Strategy "Build Back Better" From 3 points of view 1 Recovery Needs from each Infrastructure 2 Constraints (Cost, Time, Social acceptance) 3 DRR (Disaster Risk Reduction) with all infrastructure Liquefaction To decrease groundwater level (1) Horizontal boring (2) Concrete lining of irrigation channel (3) Deep wells (4) Palu River Improvement (5) Utilization of ground water for new settlement Tsunami Village (4) Padly d (6) (Wet) (3) New settlement (5) Hazard Analysis > Tsunami ➤ Nalodo ➤Seismic shake ➤ Sediment disaster ➤ Flood Seismic Shake Building Inspection Board: ✔ Design check ✔ Inspection during construction ✔ Inspection after construction ✓ Soil strength ✓ Foundation type ✓ Structural Design ✓ Programming To secure road network redundancy Danggala Pork (Pant Prohibited zone Restricted zone Controlled zone Promoted Utilization of debris) zone Balanga Memorial Park Liquefaction areal Probable Tsunami Inundation Area 50-80 m Evacuation road Beach & Mangrove Elevated Coastal Road Tsunami resistant building "Ground floor is not allowed to live Source HCA 2019 S Pelobo Memorial Park Liquefaction area) Palu City Airport Existing Outer Ring Road (New) Jona Oge Memorial Park
View entire presentation