Investor Presentaiton
Key milestones
Progressively adding capacity of value-added products
2017
Started slitting line
2010
.
2019
2020
Acquisition of Sponge Iron Unit situated at Anantapur, A.P., with a capacity of
36,000 MTPA to achieve cost efficiency and better control of the entire value chain
Enhancement of installed capacity in Furnace Unit, Rolling Mill and Pipe Mill to
264,832 MTPA
2018
Converted to a public limited company; renamed as Hariom Pipe Industries Limited
•
Started Rolling Mill Unit in May
Started Pipe Mill Unit-1 in July
2011
Started Pipe Mill II, Scaffolding Unit
2008
Started Furnace Division in February
2007
Incorporated as Hari Om Concast and
Steels Private Limited on 21st June 2007
2022
HHARIOM
PIPES SCAFFOLDINGS | COILS
•
Increased Scaffolding Unit capacity to 5000 MTPA
•
Raised Rs 130 crores (gross) through an IPO on Main
Board (NSE and BSE) on April 13
•
Furnace unit installed capacity increased to 104,232
MTPA, while rolling mill installed capacity was
increased to 124,000 MTPA
•
•
2023
Acquired operating assets with GP/GC
capacity of 180,000 MTPA located at Tamil
Nadu, resulting in product diversification
10+ new value-added products, such as GP
pipes and coils, added
Increased the Pipe Mill's capacity to 132,000
MTPA
Set up a GP Unit at Mahabubnagar, TS with a
120,000 MTPA total capacity
Rs 102.85 crores received through the issue of
warrants and equity shares
9View entire presentation