Investor Presentaiton slide image

Investor Presentaiton

Key milestones Progressively adding capacity of value-added products 2017 Started slitting line 2010 . 2019 2020 Acquisition of Sponge Iron Unit situated at Anantapur, A.P., with a capacity of 36,000 MTPA to achieve cost efficiency and better control of the entire value chain Enhancement of installed capacity in Furnace Unit, Rolling Mill and Pipe Mill to 264,832 MTPA 2018 Converted to a public limited company; renamed as Hariom Pipe Industries Limited • Started Rolling Mill Unit in May Started Pipe Mill Unit-1 in July 2011 Started Pipe Mill II, Scaffolding Unit 2008 Started Furnace Division in February 2007 Incorporated as Hari Om Concast and Steels Private Limited on 21st June 2007 2022 HHARIOM PIPES SCAFFOLDINGS | COILS • Increased Scaffolding Unit capacity to 5000 MTPA • Raised Rs 130 crores (gross) through an IPO on Main Board (NSE and BSE) on April 13 • Furnace unit installed capacity increased to 104,232 MTPA, while rolling mill installed capacity was increased to 124,000 MTPA • • 2023 Acquired operating assets with GP/GC capacity of 180,000 MTPA located at Tamil Nadu, resulting in product diversification 10+ new value-added products, such as GP pipes and coils, added Increased the Pipe Mill's capacity to 132,000 MTPA Set up a GP Unit at Mahabubnagar, TS with a 120,000 MTPA total capacity Rs 102.85 crores received through the issue of warrants and equity shares 9
View entire presentation