Investor Presentaiton
1 Case study: Prasa project
■ Scope
•
Design, manufacture and supply 600 trains.
for South Africa fleet renewal
• Parts supply & technical support for 19 years
Gibela Joint Venture led by Alstom (61%),
local factory, 65% average local content
■ Status
•
•
First train delivered from Brazil end 2015
Local factory construction started in March 2016
• First train to be manufactured in South Africa
end 2017/18
Largest contract ever in Alstom history (c. €4bn), well on its way
ALSTOM - February 2016 - P 32
ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.
This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
ALSTOMView entire presentation