Phoenix Feasibility Study 2023

95% owned flagship Wheeler River development project(1)(2) Two Low-cost development assets Phoenix - designed as a low- cost In-Situ Recovery ("ISR") operation with on-site processing to finished yellow cake (U308) Gryphon - contributes additional low-cost production via conventional underground mining with assumed toll milling at 22.5% Denison owned McClean Lake mill ~16.5 years Aggregate operating Mine life(3) 106.4M lbs U308 combined Proven & Probable Reserves (100% basis) Atlas Copco CAD$419M Estimated (100% basis) Initial CAPEX (Phoenix) 2023 Costing in NI 43-101 compliant Phoenix Feasibility Study and Gryphon PFS Update reflect current post-inflation costing environment Located within the boundaries of Treaty 10 in the traditional territory of English River First Nation, in the homeland of the Métis, and within Nuhenéné 11,720 hectares of prospective ground over 19 claims 49,000kg Sa Kerr Lenison PHOTO: Installation of large- diameter commercial scale ISR test wells at Phoenix during 2021. LINKS: Wheeler River Project Page on Denison Website NOTES: (1) Refer to the Wheeler River Technical Report titled "NI 43-101 Technical Report on the Wheeler River Project, Athabasca Basin, Saskatchewan, Canada" dated June 23, 2023. (2) Denison increased its effective interest in Wheeler River as part of the acquisition of 50% of JCU (Canada) Exploration Company, Limited. See Denison's news release dated August 3, 2021. (3) Reflects 10-year mine life estimated for Phoenix and 6.5-year mine life estimated for Gryphon. 9
View entire presentation