IEEJ May 2011 Transmission & Distribution Losses and Theft (2007-08) DISCO Transmission Losses (%) Distribution Losses (%) LESCO 12.8 Areas with greater GEPCO 11.1 private industrial load FESCO 11.2 IESCO 10.3 6.6% MEPCO 18.5 PESCO+TESCO 34.5 HESCO 35.9 QESCO 20.8 Total WAPDA 18.5 KESC 5.1% 29.0 OECD Countries Total: 7-8% The high losses need to be reduced. i) Up-gradation of transmission & distribution system; ii) Electricity consumption bills on internet and iii) Incentives to personnel of better performance grids and publicity of worst performing grids.