Investor Presentaiton slide image

Investor Presentaiton

-LEASING THE VALUE OF A CONVERSION 20+Year Aircraft Life Expected After Conversion Rerouting of Control Cables (ceiling) 9G Rigid Barrier Install a cargo loading system Maintenance Completed including: C-Check and Required Directives New Cargo Lining and Ceiling Installed Floor Beams Replaced Engine Inspection and Overhaul Install an upper deck cargo door Modified Systems: Oxygen System; ECS Modification; Venting Decompression; Water, Waste & Drain Slide I 19 ATSG
View entire presentation