Washihi Copper-Gold Project Exploration Update
009
700
7'50
800
Mineralised Zone 3
Section Profile 14
Host rock
Mineralisation
Mineralisation intercept
Hole
Pit limit
098
Section 14
Ground level
Mineralisation - Zone 3 (cont'd)
Pit Limit
Easting
-50
0
50
100
150
200
250
300
350
400
56.0
K97_263
100.2
170.0
230.35
50
100
200 Metres
Copper grade
Zinc grade
Mineralised zone
Hanging wall/ footwall
240.55
154.22
216.63
KHNC_76
K97_151
KHNC_77
17_130
K97_174
K97_275
Scale: 1:2,115
O Alara Resources Limited
www.alararesources.com
K97_101
K97_276
K97_110
Alara
resources
ALARA RESOURCES
LIMITED
Khnaiguiyah
Zinc-Copper Project
Pit Limit
Ground level
700
S14 Drill hole intersections:
K97 263: 23m @ 4.4% Zn, 0.08% Cu
KHNC 76: 8.31m @ 13.5% Zn, 0.37% Cu
K97 151: 16.78m @ 6.18% Zn, 0.31% Cu
KHNC 77: 61.7m @ 9.07% Zn, 1.22% Cu
2.6m @ 5.14% Zn, 0.05% Cu
K97 130: 4m @ 3.67% Zn, 0.3% Cu
K97 110: 9m @ 3.1% Zn, 0.14% Cu
12m @0.06% Zn, 1.89% Cu
K97 117: 4m @ 4.07% Zn, 0.04% Cu
3m @0.06% Zn, 0.61% Cu
K97_101: 64.55m @ 9.39% Zn, 0.2% Cu
HOW
Section 15
19
Alaa
resourcesView entire presentation