Washihi Copper-Gold Project Exploration Update slide image

Washihi Copper-Gold Project Exploration Update

009 700 7'50 800 Mineralised Zone 3 Section Profile 14 Host rock Mineralisation Mineralisation intercept Hole Pit limit 098 Section 14 Ground level Mineralisation - Zone 3 (cont'd) Pit Limit Easting -50 0 50 100 150 200 250 300 350 400 56.0 K97_263 100.2 170.0 230.35 50 100 200 Metres Copper grade Zinc grade Mineralised zone Hanging wall/ footwall 240.55 154.22 216.63 KHNC_76 K97_151 KHNC_77 17_130 K97_174 K97_275 Scale: 1:2,115 O Alara Resources Limited www.alararesources.com K97_101 K97_276 K97_110 Alara resources ALARA RESOURCES LIMITED Khnaiguiyah Zinc-Copper Project Pit Limit Ground level 700 S14 Drill hole intersections: K97 263: 23m @ 4.4% Zn, 0.08% Cu KHNC 76: 8.31m @ 13.5% Zn, 0.37% Cu K97 151: 16.78m @ 6.18% Zn, 0.31% Cu KHNC 77: 61.7m @ 9.07% Zn, 1.22% Cu 2.6m @ 5.14% Zn, 0.05% Cu K97 130: 4m @ 3.67% Zn, 0.3% Cu K97 110: 9m @ 3.1% Zn, 0.14% Cu 12m @0.06% Zn, 1.89% Cu K97 117: 4m @ 4.07% Zn, 0.04% Cu 3m @0.06% Zn, 0.61% Cu K97_101: 64.55m @ 9.39% Zn, 0.2% Cu HOW Section 15 19 Alaa resources
View entire presentation