NHPC Capacity Addition and Financial Overview slide image

NHPC Capacity Addition and Financial Overview

NHPC - Projects in Operation... contd. एनएचपीसी NHPC Installed S.No. NHPC Project Capacity Design Energy Year of Comm. Capital Cost as on 31.03.23 Tariff (18-19) (Rs. /kwh)* (MW) (MU) 11 Teesta-V, (3x170) 510 2572.70 2008 2848.52 Type of the project 2.84 ROR with small pondage Sikkim (Mar) 12 Sewa-II, (3x40) 120 533.53 2010 1155.29 5.50 ROR with small pondage UT of J&K (Jun) 13 Chamera-III, (3x77) 231 1108.17 2012 2146.85 3.94 ROR with small pondage Himachal Pradesh (Jun) 14 Chutak, (4x11) 44 212.93 2013 945.34 9.89 ROR UT of Ladakh (Jan) 15 TLDP-III, (4x33) 132 594.07 2013 1942.69 5.30 ROR with small pondage West Bengal (Mar) 16 Nimoo Bazgo, (3x15) 45 239.33 2013 1071.21 10.62 ROR with small pondage UT of Ladakh (Jan) 17 Uri -II, (4x60) 240 1123.77 2014 2362.43 5.38 ROR UT of J&K (Feb) 18 Parbati-II (4x130) 520 1963.29 2014 2726.61 Himachal Pradesh (May) TLDP IV (4×40) 2016 1822.27 19 160 717.72 4.35 West Bengal (Aug) Kishanganga (3x110) 20 1 (3x110) 2018 330 1712.96 5711.55 UT of J&K (Mar) Total-A 5451 24601.37 39816.85 3.88 3.08 ROR with small pondage OR with sm Run of River with small poundage 4.45 Run of River with Pondage * Tariff for 2019-20, 2020-21 and 2021-22 yet to be notified.
View entire presentation