NHPC Capacity Addition and Financial Overview
NHPC - Projects in Operation... contd.
एनएचपीसी
NHPC
Installed
S.No.
NHPC Project
Capacity
Design
Energy
Year of
Comm.
Capital Cost
as on 31.03.23
Tariff (18-19)
(Rs. /kwh)*
(MW)
(MU)
11
Teesta-V, (3x170)
510
2572.70
2008
2848.52
Type of the project
2.84 ROR with small pondage
Sikkim
(Mar)
12
Sewa-II, (3x40)
120
533.53
2010
1155.29
5.50 ROR with small pondage
UT of J&K
(Jun)
13
Chamera-III, (3x77)
231
1108.17
2012
2146.85
3.94 ROR with small pondage
Himachal Pradesh
(Jun)
14
Chutak, (4x11)
44
212.93
2013
945.34
9.89
ROR
UT of Ladakh
(Jan)
15
TLDP-III, (4x33)
132
594.07
2013
1942.69
5.30 ROR with small pondage
West Bengal
(Mar)
16
Nimoo Bazgo, (3x15)
45
239.33
2013
1071.21
10.62 ROR with small pondage
UT of Ladakh
(Jan)
17
Uri -II, (4x60)
240
1123.77
2014
2362.43
5.38
ROR
UT of J&K
(Feb)
18
Parbati-II (4x130)
520
1963.29
2014
2726.61
Himachal Pradesh
(May)
TLDP IV (4×40)
2016
1822.27
19
160
717.72
4.35
West Bengal
(Aug)
Kishanganga (3x110)
20
1 (3x110)
2018
330
1712.96
5711.55
UT of J&K
(Mar)
Total-A
5451
24601.37
39816.85
3.88
3.08 ROR with small pondage
OR with sm
Run of River with small
poundage
4.45 Run of River with Pondage
* Tariff for 2019-20, 2020-21
and 2021-22 yet to be notified.View entire presentation