PTTEP Project and Financial Overview

Projects Details | Thailand 1 Arthit PTTEP Project Name Status Phase Participating Interest* (%) Sales Vol Gas (MMSCFD) Sales Vol Liquid Latest Status (KBPD) Operator Production PTTEP 80% 277 15 Increase Sales Gas DCQ from 220 to 280 MMSCFD in Feb'22 Chevron 20% MOECO 4% Operator Production PTTEP 100% . 2 B6/27 JV Production 3 B8/32 and 9A PTTEP 25.01% 60 50 Chevron 51.66% MOECO 16.71% KrisEnergy 4.63% Palang Sophon 2% 4 Bongkot Operator Production PTTEP 66.67% 819 TotalEnergies 33.33% 11 Prepare for decommissioning activities Ensure gas deliverability level at DCQ Drill development wells Preparation for wellhead platform reuse in 2022-23 22 22 Infills drilling for BKT Sole investment Maintain production level as planned Carry out wells plug and abandonment, Pipeline cleaning and Hg decontamination Wellhead platform & sealine and FSO1 PLEM Decommissioning (Non- transferred asset) Decommissioning activities JV Production 5 CT3 (formerly Unocal III) PTTEP Chevron 5% 71.25% 206 13 MOECO 6 OCT4 (formerly Pailin) JV Production . PTTEP 60% 403 16 Ensure gas deliverability level at DCQ . Chevron 35% MOECO 5% JV Production 7 E5 PTTEP 20% 8 Drill development wells Topside reuse Ensure gas deliverability level at DCQ EXXON MOBIL 80% Note: * PTTEP denotes respective PTTEP subsidiaries participating in the project ** Sales volume represent average volume for 100% of the project during Q1/2022 *** Status: OP PTTEP operatorship/JOC = PTTEP joint operatorship/ JV = PTTEP Joint Venture Partner **** DCQ Daily Contractual Quantity 34 =4
View entire presentation