Goldboro 2021 Feasibility Study: A Robust Open Pit Project slide image

Goldboro 2021 Feasibility Study: A Robust Open Pit Project

Scale Upside: Near-Surface Mineral Resource Growth Potential Opportunity for resource growth to the west, towards the past producing Dolliver Mountain gold mine • Signal Gold has completed a 50-line kilometer Induced Polarization (IP) geophysical survey for 1.4 km meters west of Goldboro, towards and through the historic Dolliver Mountain Gold Mine • The IP survey has defined mineralization to the west of the current deposit and has identified parallel signatures . These anticline /saddle reef are analogous to the Victorian Goldfields, which are kilometres known to continue at depth for multiple TSX: SGNL | OTCQX: SGNLF 5005000 5005600 5006200 5006800 5007400 250 500 Meters Projection: NAD83 UTM Zone 20 Scale: 1:17,500 604000 604000 604800 605600 606400 1,000 Gold Brook Lake 607200 608000 Recent IP Survey Current Drilling 1.4 km Limit of Previous Resource Drilling Goldboro Deposit Past Producing Dolliver Mountain Mine Isaacs Harbour West Pit East Pit Legend Historic Mine Shaft Open Pit IP Chargeability Value Low: 2.63308 604800 605600 606400 607200 608000 High: 29.3027 5005000 5005600 5006200 10 5006800 5007400 SIGNAL -GOLD-
View entire presentation