ENGIE Investor Presentation REGULATORY CHANGE (2/3) Contract Reference Factor (FRC)* COES published the technical procedure PR-25, which reduces only the SoP of Transportation from 100% to a fraction of it called FRC FRC June 1, 2021 - April 30, 2025 Will be determined as the quotient between the volume of gas required according to the projected I dispatch of the COES and the I volume required at effective power of the unit. (COES maintains that it should be one for rainy season \ and another for low water levels) Technology FRC Plant M m3/day Open Cycle Combined Cycle 11.44% Chilca Dos 332.54 65.74% Chilca Uno 2,259.14 *Resolution of the board of directors, Supervisory Agency for Investment in Energy and Mining OSINERGMIN N° 096-2021-OS/CD ENGIE Energía Perú 10