Petrobras' Energy Sector Outlook
SHIP POWER
Construction of 137 Units: Drilling, Production and Vessels
Oil Production, Brazil: 2,022- 4,200 kbpd
23 PU contracted
15 to be contracted
2
PU
3
PU
7
2
PU
7
Drilling
rigs
PU
7
Oil and NGL production curve (kbpd)
PU
1
6.
Drilling
9
Drilling
rigs
2
4
5
PU
8
rigs
6
Vessel
PU
PU
PU
A
Drilling
5
5
8
rigs
10
Drilling
rigs
Vessel
(10)
4.200
1
4
Drilli
contracted
2
Rig
28 Drilling Rigs
5 to be contracted
2
Vessel
5
Vessel
(17)
Drilling
8
rigs
8
Vessel
(15)
49 Ships
contracted
8
Vessel
S
Vessel
(20)
3
1 Vessel
Vessel
3
Vessel
S
5
(23)
2.500
S
(9)
2.022(1)
(12)
38 Production Unit (PU) up to 2020
(21)
(9)
Construction of
50 Drilling Rigs up to 2020
49 Ships up to 2020
2011
2012
2013
2014
2015
2016
2017
2018
Petrobras' CEO presentation 20th September 2012
© Wärtsilä
2019
2020