Investor Presentaiton
Sihayo Starter Project - Overview
Attractive Starter Project generating a LOM - US$1.2bn gross sales over an initial 8 years mine life at a flat US$1,890/oz Au price
Summary
Sihayo Starter Project Cross Section
Production: 635koz¹ recovered Au LOM
Key DFS Findings
(LOM)
Cash operating cost: US$632/oz
Peak funding cost: US$153m
-1250m RL
Sihayo-2
1000mRL
Sihayo-1
Link Zone
B
1250mRL-
Potential to extend resource
between open Sihayo SE and
Sambung NW strike-projections
Sambung
1000m RL-
Early Works/
Permitting
Underway
Near-Mine
Resource Upside
Mining
Processing
NPV5: US$268m at US$1,890/oz Au flat
Early works include establishment of site access, environmental
baseline, legal permits and social licence to operate
Amendments to existing permits simplifies approval process
Early regional road upgrades to fast-track first production
Evidence of additional mineralization along strike
Strong potential for resource extensions
13.7Mt ore mined at a 4.4x stripping ratio
Early stages targeting lower strip, oxidised, free-dig regolith
material
Bulk waste stripping campaign delayed until the 4th year of
mining
Conventional CIL process
Throughput: 2Mtpa soft ore / 1.5Mtpa hard ore
Potential to extend resource
along open NW strike-projection:
-750mRL
1250mRL
Potential to extend resource
along open NE down-dip (off long section)
and at depth.
Sihayo-1
Sihayo-2
1000mRL
1
Limited historic drilling
Geology poorly defined
750mRL
Mineralised intercepts returned.
Explanation
Regolith
Jasperoid
Siliciclastic sandstone/shale
Diorite
Silty sandy limestone (dirty)
Crystalline limestone (marble)
Drill hole trace
projected to long section
2020 DFS pit shells
(0.6 g/t Au cut-off)
Link Zone
Potential to extend resource
along open NE down-dip
and open SE strike projection
750mRL
1250mRL-
Sambung
Limited historic drilling
Mineralised intercepts returned
Geology poorly defined
1000m RL
SIHAYO - SAMBUNG LONG SECTION (NW-SE) - Looking NE
INTERPRETED GEOLOGY PROJECTED DRILL HOLE TRACES
0
500
metres
1000
A •
Sihayo-2
750mRL
PLAN
500m RL
Shero-1
Link Zone
Vertical: horizontal exaggeration 2:1
Showing long section trace
JORC Reserves and Resources³
Sambung
B
Owner-Operator
Strategy
Average metallurgical recovery: 71%²
Mining fleet sized for selective mining strategy
Bulk waste stripping fleet for better utilisation
Reserves
Resources
Ore (Mt)
12.5
Grade (g/t Au)
2.1
Moz Au
0.84
24.0
2.0
1.50
Page 8
123
2.
1. 169koz Au produced in the first two years during the low-strip stage of operations
Higher % recoveries in the early years, coinciding with lower strip, oxidised, free-dig regolith material
3.
Reported in accordance with the 2012 edition of the JORC Code. Mineral Resources estimate reported at 0.6g/t Au cut-off grade. Ore Reserves are based on US$1,450/oz gold
price assumption. Refer to ASX announcement on 23 June 2020 "Results of Feasibility Study" for further information
SIHAYO GOLDView entire presentation