PERU LNG 2021 Annual Report
ANNUAL REPORT
PERU LNG 2021
MONITORING BIOREMEDIATION WORK
Permanent bioremediation work is carried out to re-establish
the natural condition of areas affected during the construction
of the gas pipeline.
In the 2021-2022 bioremediation campaign we plan to plant
native species on 6.86 kilometres of the right of way, maintain
fences to prevent overgrazing and improve the soil be removing
stones. This work has re-established the native vegetation over
most of the distance disturbed during construction.
BIODIVERSITY
MONITORING
PROGRAMME (BMAP)
AND
ASSESSMENT
This program was conceived by PERU LNG together with the
Center for Conservation, Education and Sustainability (CCSE)
of the Smithsonian Conservation Biology Institute (SCBI), with
the aim of preserving biodiversity during construction work and
operation of the pipeline, plant and port facility.
The BMAP uses biological evaluations and monitoring to
determine the condition of species, their habitats and changes
over time. This information was used to draw up guidelines so
that PERU LNG can take decisions that help to mitigate any
impact on biodiversity.
The following research protocols were developed in 2021:
• Pasture on the Andean Plateau
• Wetland vegetation
• Rodents of the high Andean pasture
OLP
CHAPTER 6
WORKING WITH RESPONSIBILITY AND
COMMITMENT