Investor Presentaiton
5002
4002
3002
2002
Yangibana Project – The Year in Review
-
Looking North
Top of fresh rock
Bald Hill Trial Grade Control Area
Res Cat
ind
inf
mea
Pit Design
Bald Hill Section
7 356 370 N
Resource Block Model Coloured by Resource Category
Grade Control Results
2002
Geology Legend
Ironstone
Meta-sandstone
Granites
Dolerite
Pelitic Schist
Quartz vein
L
40
Ore Sorting testwork Results
163
HASTINGS
Technology Metals Limited
Category
Tonnes
%TREO
%Nd₂O3+Pr6011
TREO t
26% upgrade to the life of mine total rare earths oxide (TREO) grade;
96% overall TREO recoveries after ore sorting;
Grade Control
140,688
1.04
0.43
1,457
Mineral
Resource
129,505
1.06
0.44
1,377
Difference
8.9%
5.8%
428360m
350m
7.1% improvement in concentrate recovery on sorted Simon's Find ore samples;
8.0% improvement in concentrate recovery on sorted Bald Hill ore samples;
24% upfront mass rejection of primary crusher feed, resulting in:
24% reduction of beneficiation plant reagent consumption;
24% reduction in required tailings storage facility size
Hastings Technology Metals Limited (HAS.ASX)
Investor Presentation, 25 November 2021
11View entire presentation