Lordstown Endurance Investor Presentation
·
•
Modest Facility Retooling Needs
~$120MM Modest retooling + reconfiguration needs, but greater vehicle
Estimated Investment
Stamping
New soft
tooling for
three presses
required for
production
The remaining
four presses
could be
removed and
sold at auction
demand means we are likely to expand the plant
Body Shop
Minimal
investment
required in new
fixtures,
welding tools,
and a truck box
robotic cell
$32MM
•
.
Paint
Equipment in
place and
sufficient in
size to
manufacture
Endurance
Converting
paint line from
dry powder
coating to "wet
on wet" paint
$16MM
•
Battery
Packing
Hub Motor
Manufacturing
Reconfiguration
•
Electric in-
•
wheel hub
motor
of area above
final assembly
to create a
battery packing
assembly line
New robot
tooling and
quality & test
equipment
required
$27MM
production line
requires
purchase of
additional CNC
machines,
tooling, and
quality and test
equipment
$23MM
General
Assembly
Existing state-
of-the-art
skillet conveyor
system large
enough for
Endurance; only
minimal
modifications
required
$14MM
Estimated
Investment
Estimated
Estimated
Investment
$3MMM
Estimated
Investment
Other
~$5MM
Estimated
Investment
Estimated
Investment
Estimated
Investment
Investment
Physical infrastructure, security, and IT infrastructure are in place and in
good working condition requiring only marginal investment
Source: Management estimates
Investor Presentation | January 2021
23View entire presentation