Investor Presentaiton
Toward eliminate production problems
Following the occurrence of main equipment malfunctions in AC production facility at the
Mizushima Plant, we will implement (1) Improving facility management level (2) Strengthening of
supply stabilization, from a business continuity plan perspective
Improve Diagnostic
Technology
Enhance non-destructive testing
Review deterioration diagnosis
items
Acquire and improve diagnostic
techniques
Facility Management
Updated facility management system in FY2021
Update
Facilities/Equipment
Optimize production lines for
large-sized critical equipment
Implement improved
maintenance
(Increase efficiency and life span)
Enhance Cycle
Management
Reset and standardize
maintenance cycles
Reset and standardize
device update cycles
Spare Equipment and
Parts Management
Standardize retention
indicators
Shared use of spare parts
(1) Improving facility management level
Strengthen management by select the most important
equipment that has a significant impact on production
Expand spare parts for the most important equipment
Shorten and clarify update cycles
(2) Strengthening of supply stabilization
Implement company-wide measures such as tightening
operational management and improving skills
Clarify proper operating ranges based on analysis through
flow simulations
Strengthening early recovery system (Double tracking,
installation of spare equipment, etc.)
Investment for enhancing facility management: ¥1.5 billion (3 years)
Something Better with Chemicals
OSAKA SODA
30View entire presentation