Investor Presentaiton slide image

Investor Presentaiton

• Midcon Operating Cost Structure Since 2016, the Company lowered its annual absolute LOE by ~75% and its LOE per Boe by ~30% Overview 10 Reduced annual absolute LOE by ~75% since 2016 LOE(24) $150 $5.52 LOE Expense Workover LOE/Boe $6.0 Per Boe LOE by ~30% ■ Continuous review of individual well profitability to assess well reactivation or curtailment decisions Decreased average workover cost Improved run time via design Decreased job costs through reduced cycle times, owned equipment utilization Reduced field personnel from 231 to 85 while maintaining high safety standards ■ 24-hour Operations Center with advanced SCADA telemetry ensuring activity optimization, as well as monitoring to help prevent safety or environmental issues Optimized and rebid compressor usage and lowered generator usage SD LOE ($MM) $5.15 $4.90 $4.58 $16.0 $100 $3.90 $3.64 $4.0 $13.2 $11.3 $13.9 $50 $104.1 $2.0 $62.8 $6.1 $9.0 $53.7 $53.7 $28.3 $26.2 $0 2016 2017 2018 LOE + Expense Workovers ($/Boe) - SD vs. Peers (25) 2019 2020 2021 in LOE/Boe ($/Boe) $24.19 ☐ Optimized use of chemical treatments and continued rebidding of supplies to ensure optimal costs $16.04 $14.92 $13.47 $12.32 Peer Average: $10.64 $8.94 $9.21 $7.95 $6.44 $4.23 $4.54 $5.30 W/O $5.46 LOE Peer 1 Peer 2 SD 2021 Peer 3 Peer 4 Peer 5 Peer 6 Peer 7 Peer 8 Peer 9 Peer 10 Peer 11 Peer 12 SandRidge Energy, Inc. NYSE: SD
View entire presentation