Investor Presentaiton slide image

Investor Presentaiton

MRP Essential Indicators 1. 2. Details of total energy consumption (in Joules or multiples) and energy intensity Parameter Total electricity consumption (A) Giga Joules ("GJ") Total fuel consumption (B) GJ Energy consumption through other sources (C) GJ Total energy consumption (A+B+C) GJ Energy intensity per rupee of turnover: GJ/Cr. (Total energy consumption/turnover in rupees) FY 2022-23 3150668 4974712 8125380 359.88 FY 2021-22 2999572 4956037 7955609 418.96 Note: Indicate if any independent assessment/ evaluation/assurance has been carried out by an external agency? (Y/N) If yes, name of the external agency. No independent assessment/ evaluation/assurance has been carried out. Does the entity have any sites/facilities identified as designated consumers (DCs) under the performance, achieve and trade (PAT) Scheme of the Government of India? (Y/N) If yes, disclose whether targets set under the PAT scheme have been achieved. In case targets have not been achieved, provide the remedial action taken if any. Not applicable. There are no sites/facilities that have been identified as Designated Consumers (DCs) under the Performance, Achieve and Trade (PAT) Scheme of the Government of India. 3. Provide details of the following disclosures related to water, in the following format Parameter Water withdrawal by source (in kilolitres) (i) Surface water (ii) Groundwater (iii) Third-party water (municipal water supplies) (iv) Seawater/ desalinated water (v) Others Total volume of water withdrawal (in kilolitres) (i + ii + iii + iv + v) Total volume of water consumption (in kilolitres) Water intensity per rupee of turnover: Kilolitres/ Cr. (water consumed / turnover) FY 2022-23 FY 2021-22 0 0 1183267 1151083 1595494 1574315 0 0 119035 95193 2897796 2897796 128.34 2820591 2820591 148.53 Note: Indicate if any independent assessment/ evaluation/assurance has been carried out by an external agency? (Y/N) If yes, name of the external agency. No independent assessment/ evaluation/assurance has been carried out. 73
View entire presentation